Category: Sketch/Feasibility

01
Dec

A new garden studio in the Belsize Park Conservation Area.

Garden Studio Extension | Architects for Camden | Belsize Park, North West London

forresterarchitects have submitted a design feasibility for a discreet pergola-inspired garden structure to a house in the Belsize Conservation Area. The design proposal expresses the requirements of the brief within an accordion structure. The concept is an exploration of the traditional garden pergola. It offers a modern architectural solution, which respects and contributes to the character of the site and its immediate environmentThe new structure is orientated north/south to enhance and create a visual dialogue between the studio and the garden beyond.

21
Oct

Stay tidy. A bachelor pad with extensive bespoke storage solutions.

House Refurbishment | Architects for Camden | Primrose Hill, North West London

forresterarchitects have provided a design feasibility study for the house refurbishment of a duplex apartment in Primrose Hill.  The duplex flat is part of a modern purpose-built development in the fashionable area in North London. As a bachelor, the client was able to indulge his needs with specific requirements to keep the place tidy. The flat layout was simple. The design employs bespoke storage solutions to create living wall solutions to maximise on space. Sliding doors avoid taking up valuable space but also allow for an open plan feel when left in the open.

01
Sep

A design feasibility study for a twin townhouse in the Bloomsbury Conservation Area.

Twin Townhouse Refurbishment | London Borough of Camden | Bloomsbury, West Central London

forresterarchitects have submitted a design feasibility for twin townhouse refurbishments off Oxford Street in Central LondonWith the development of a more modern family life, in whatever form this may take,  house layouts are no longer realising their full potential. The works aim to re-establish the internal hierarchy of a late Victorian house. Formal receptions rooms will be retained on the ground and first floor with bedrooms on the upper floors. The kitchen and dining rooms will be retained on the lower ground floor. Both properties will be rewired with new plumbing throughout.